Court-ordered dates
Dates set by a court for a step, as the National Listing WorkplanNational Listing Workplan: The agency's public plan of listing work, year by year. lists them.
| Species | Step | Date | Source |
|---|---|---|---|
| Canada Lynx | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 56 |
| Mount Graham red squirrel | proposed revised critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 101 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 18 |
| No common name | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 86 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 162 |
| Elongate-gland Springsnail | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 138 |
| Sand flax | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 114 |
| `Anunu | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 144 |
| Kamapua`a | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 152 |
| `Ohe | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 175 |
| `Aiea | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 140 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 168 |
| Fragile tree snail | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 6 |
| Fragile tree snail | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 74 |
| Correll''s false dragonhead | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 186 |
| Ma`oli`oli | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 157 |
| Texas salamander | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 95 |
| Key ring-necked snake | final rulefinal rule: The decision that puts a listing or a habitat rule into effect. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 44 |
| Wood turtle | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 125 |
| Florida Keys mole skink | final rulefinal rule: The decision that puts a listing or a habitat rule into effect. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 48 |
| Humped tree snail | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 8 |
| Humped tree snail | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 76 |
| Florida pondweed | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 196 |
| Makou | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 155 |
| Orangefin madtom | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 55 |
| Hohiu | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 148 |
| [unnamed] brush-pea | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 97 |
| Anchialine pool Shrimp | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 67 |
| Ha`iwale | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 146 |
| Dunes sagebrush lizard | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 187 |
| Ihi | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 150 |
| Makou | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 156 |
| Black-capped Petrel | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 219 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 169 |
| Godfreys stitchwort | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 197 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 172 |
| Blanding's turtle | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 40 |
| Ufa-halomtano | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 25 |
| Ufa-halomtano | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 93 |
| Bluestripe darter | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 189 |
| Slenderwrist burrowing crayfish | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 122 |
| Pineland sandmat | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 111 |
| Streaked Horned lark | proposed ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 27 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 174 |
| Mariana eight-spot butterfly | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 11 |
| Mariana eight-spot butterfly | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 79 |
| Everglades bully | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 108 |
| Assimulans yellow-faced bee | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 180 |
| Sunfacing coneflower | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 123 |
| Florida hartwrightia | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 195 |
| Spectaclecase (mussel) | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 39 |
| Harper's fimbristylis | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 209 |
| Three-tooth long-horned caddisfly | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 207 |
| Florida pineland crabgrass | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 109 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 170 |
| Rio Grande shiner | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 32 |
| Peppered shiner | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 49 |
| Roughhead shiner | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 217 |
| Alligator snapping turtle | final rulefinal rule: The decision that puts a listing or a habitat rule into effect. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 118 |
| Kirtland's snake | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 41 |
| Mariana wandering butterfly | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 12 |
| Mariana wandering butterfly | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 80 |
| Nanu | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 159 |
| Limestone salamander | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 211 |
| Blodgett's silverbush | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 113 |
| Florida prairie-clover | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 110 |
| Snuffbox mussel | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 38 |
| Hawaiian yellow-faced bee | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 184 |
| `Ena`ena | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 145 |
| Anthricinan yellow-faced bee | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 179 |
| Relictual slender salamander | final rulefinal rule: The decision that puts a listing or a habitat rule into effect. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 130 |
| Kolea | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 153 |
| rim rock crowned snake | final rulefinal rule: The decision that puts a listing or a habitat rule into effect. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 45 |
| Rayed Bean | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 36 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 164 |
| Easy yellow-faced bee | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 181 |
| Orangeblack Hawaiian damselfly | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 177 |
| Popolo | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 178 |
| Cascade Caverns salamander | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 94 |
| Holei | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 149 |
| Maui reedgrass | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 158 |
| Big Pine partridge pea | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 112 |
| Chisos Mountain crested coralroot | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 98 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 171 |
| White Sands pupfish | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 35 |
| Arizona toad | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 96 |
| Striped newt | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 220 |
| Langford's tree snail | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 9 |
| Langford's tree snail | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 77 |
| Shasta sideband | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 60 |
| Sheepnose Mussel | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 37 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 141 |
| Longnose darter | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 121 |
| Guam tree snail | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 7 |
| Guam tree snail | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 75 |
| Wedge spurge | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 115 |
| Domed ancylid | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 194 |
| Hilaris yellow-faced bee | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 182 |
| Brook floater | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 216 |
| Pacific sheath-tailed Bat | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 20 |
| Pacific sheath-tailed Bat | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 88 |
| Kern Canyon slender salamander | final rulefinal rule: The decision that puts a listing or a habitat rule into effect. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 129 |
| Berry Cave salamander | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 214 |
| Cascade torrent salamander | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 1 |
| Columbia torrent salamander | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 2 |
| Rota blue damselfly | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 22 |
| Rota blue damselfly | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 90 |
| Oregon Vesper Sparrow | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 70 |
| Golden-winged warbler | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 104 |
| Wintu sideband | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 61 |
| Shasta chaparral | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 58 |
| Shasta hesperian | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 59 |
| Big Bar hesperian | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 57 |
| Pedernales River Springs salamander | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 188 |
| Ferris''s copper | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 31 |
| Landyes pyrg | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 132 |
| Neritiform Steptoe Ranch pyrg | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 133 |
| Sub-globose Steptoe Ranch pyrg | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 137 |
| Flat-topped Steptoe pyrg | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 131 |
| Northern Steptoe pyrg | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 134 |
| Sterile Basin pyrg | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 136 |
| Southern Steptoe pyrg | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 135 |
| Hawaiian yellow-faced bee | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 185 |
| Hawaiian yellow-faced bee | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 183 |
| Rusty patched bumble bee | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 42 |
| Heau | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 147 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 151 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 143 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 160 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 163 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 161 |
| loulu | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 68 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 173 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 166 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 142 |
| olua | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 176 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 167 |
| Cebello halumtano | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 23 |
| Cebello halumtano | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 91 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 15 |
| No common name | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 83 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 13 |
| No common name | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 81 |
| Paudedo | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 21 |
| Paudedo | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 89 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 16 |
| No common name | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 84 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 17 |
| No common name | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 85 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 10 |
| No common name | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 78 |
| Aplokating-palaoan | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 3 |
| Aplokating-palaoan | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 71 |
| Berenghenas halomtano | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 4 |
| Berenghenas halomtano | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 72 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 19 |
| No common name | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 87 |
| Fadang | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 5 |
| Fadang | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 73 |
| Slevin's skink | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 24 |
| Slevin's skink | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 92 |
| Streamside Salamander | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 43 |
| Dukes' skipper | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 116 |
| Palatka skipper | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 117 |
| Logan's Agarodes caddisfly | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 198 |
| Sykora's Hydroptila caddisfly | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 204 |
| Coastal Lowland Cave crayfish | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 193 |
| Southern snaketail | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 203 |
| Santa Fe Cave crayfish | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 201 |
| Yellow-sided clubtail | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 208 |
| Bigcheek Cave crayfish | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 191 |
| Piebald Madtom | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 50 |
| Chesapeake logperch | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 53 |
| Bridled darter | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 119 |
| Blueridge springfly | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 51 |
| Spider elimia | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 124 |
| Western Chicken turtle | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 102 |
| Arkansas mudalia | proposed ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 190 |
| Sevier snowfly | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 202 |
| Karst snowfly | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 120 |
| Tennessee forestfly | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 205 |
| Lobed roachfly | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 52 |
| Meadow joint-vetch | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 199 |
| Ciliate-leaf tickseed | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 46 |
| Raven's seedbox | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 200 |
| Thin-wall quillwort | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 206 |
| Blue Calamintha Bee | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 192 |
| swale paintbrush | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 34 |
| Western Bumble bee | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 126 |
| Eastern Black rail | proposed ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 47 |
| No common name | proposed critical habitat ruleproposed rule: A draft decision. It is published so anyone can comment before it becomes final. | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 14 |
| No common name | final critical habitatcritical habitat: Places the agency marks as needed for the species to recover. rule | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 82 |
| Mojave poppy bee | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 62 |
| Clover's cactus | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 99 |
| Tall western penstemon | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 28 |
| American bumble bee | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 103 |
| Variable Cuckoo Bumble Bee | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 105 |
| Railroad Valley toad | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 212 |
| Southern Plains Bumblebee | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 213 |
| Kings River pyrg | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 218 |
| Mazama newt | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 139 |
| White sturgeon | 12-month finding12-month finding: The agency's answer after a full review: should the species be listed or not? | Marked court-ordered, date not stated (National Listing Workplan, version 2026-07-28). | Workplan row 63 |